public-safety
Road work: grading, miscellaneous construction, utilities work listed on SD-28 from Aug. 25, 2026
The South Dakota Department of Transportation lists Road work: grading, miscellaneous construction, utilities work at SD-28 from 2 miles east to 2.50 miles east of Junction South Dakota 15 near Toronto, with a listed start of Aug. 25, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Road work: grading, miscellaneous construction, utilities work is listed at SD-28 from 2 miles east to 2.50 miles east of Junction South Dakota 15 near Toronto, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as SD-28, the reference milepost as 97.726 and the affected direction as Both Directions.
The feed publishes a listed start of Aug. 25, 2026, 7:21 a.m. MDT / 8:21 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 44.57279761, -96.64257378 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is in progress: grading, miscellaneous construction adjacent to the roadway, and utilities work with delays 10 minutes, flaggers, lanes reduced to 1, no passing, speed limit 25 mph, traffic routed to opposing lanes, and width limit 10 ft until further notice. Urban Reconstruction thru Toronto with 10' Width Restriction. Local traffic will be maintained as two way traffic thru town. This project is currently in Phase 2 with two way traffic running on the temporary surfacing placed in Phase 1. Asphalt Paving of both Phase 1 and Phase 2 will occur this fall.
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
The feed links dot.sd.gov/toronto28 for this project.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.