public-safety
Road work: grading listed on SD-38 from June 15, 2026
The South Dakota Department of Transportation lists Road work: grading at SD-38 from 6 miles west of Junction South Dakota 25 to Junction South Dakota 25, with a listed start of June 15, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Road work: grading is listed at SD-38 from 6 miles west of Junction South Dakota 25 to Junction South Dakota 25, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as SD-38, the reference milepost as 14.640 and the affected direction as Both Directions.
The feed publishes a listed start of June 15, 2026, 6 a.m. MDT / 7 a.m. CDT and a listed end of Nov. 20, 2026, 4 p.m. MST / 5 p.m. CST. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 43.70227284, -97.74606024 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is in progress: ROAD CLOSED and grading with local traffic until 5:00 PM CST Friday, November 20, 2026. SD 38 is closed to traffic from SD25 west 6 miles to 421st Ave. A signed detour is in place on US81, Interstate 90, and SD38P (Riverside Road).
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
The feed links dot.sd.gov/mitchell38 for this project.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.