Skip to main content

public-safety

Road work: grading listed on I-90 from July 27, 2026

The South Dakota Department of Transportation lists Road work: grading at I-90 from 1.50 miles west of Piedmont-Exit 46 to Summerset-Exit 48, with a listed start of July 27, 2026.

605Buzz automated newsroom, from public records Added Record date Updated

Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.

Road work: grading is listed at I-90 from 1.50 miles west of Piedmont-Exit 46 to Summerset-Exit 48, according to the South Dakota Department of Transportation's traveller-information feed.

The feed gives the route as I-90, the reference milepost as 46.899 and the affected direction as Eastbound.

The feed publishes a listed start of July 27, 2026, 9:28 a.m. MDT / 10:28 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.

Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.

The feed publishes coordinates of 44.22220753, -103.37532387 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.

The department's own description of the work, reproduced without changes as published in the feed:

The following road construction project is in progress: grading adjacent to the roadway eastbound until further notice. A project to reconstruct Exit 46 is underway with grading occurring adjacent to the eastbound lanes. There is currently no restriction to traffic on the interstate.

For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:

https://dot.sd.gov/inside-sddot/region-area-offices/region-and-area-offices/

That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.

The feed links dot.sd.gov/i90exit46 for this project.

605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.

See something wrong? Suggest a correction — every correction ships with a diff + timestamp.

How this desk works

Where this comes from

This record comes from the South Dakota Department of Transportation's public traveller-information feed, served through its vendor's content network. Neither host publishes a robots.txt or terms-of-use page, so no access directive exists either way; 605Buzz reproduces the department's own fields with attribution and does not claim a licence nobody granted.

How the times are shown

The feed publishes start and end as numeric timestamps, so each is shown as a clock reading in both of South Dakota's zones.

How the status is decided

Whether work is currently underway is not written into the article text, deliberately: it depends on when you are reading. 605Buzz computes it from the listed dates each time the page loads rather than storing an answer that would go out of date without anyone noticing. The status at the top of the page is that computation, not a claim the department made.

605Buzz does not rewrite the department's description, and a detail inside it can be superseded without the surrounding fields changing.

Search every article 605Buzz has published.