public-safety
Road work: miscellaneous construction listed on SD-1889 from Aug. 28, 2026
The South Dakota Department of Transportation lists Road work: miscellaneous construction at SD-1889 from 0.50 mile east to 0.75 mile east of Junction US 14-Pierre, with a listed start of Aug. 28, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Road work: miscellaneous construction is listed at SD-1889 from 0.50 mile east to 0.75 mile east of Junction US 14-Pierre, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as SD-1889, the reference milepost as 0.578 and the affected direction as Both Directions.
The feed publishes a listed start of Aug. 28, 2026, 12:37 p.m. MDT / 1:37 p.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 44.372822, -100.348509 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is in progress: miscellaneous construction adjacent to the roadway until further notice. Crews will be working adjacent to the outside lanes. Travelers recommended to reduce speed wile crews are working to finish work behind the curb and gutter.
Anticipate work to continue in this area until the end of September.
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
The feed links dot.sd.gov/projects-studies/construction-projects/us-highway-14-and-83-euclid-ave for this project.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.