Skip to main content

public-safety

Pavement repair narrows eastbound I-90 near Valley Springs

Crews are fixing concrete in the driving lane from half a mile west of the Valley Springs exit (Exit 410) to the exit itself.

605Buzz Added Record date

Published from public-record data.

Key facts

What
Public safety
When
Record date Nov. 17, 2026; Added Nov. 18, 2026
Source
Road work and restrictions
Read time
About 1 minute

How this desk works (below the article)

Drivers heading east on I-90 near Valley Springs are hitting a pavement repair in the driving lane between a point half a mile west of the Valley Springs exit (Exit 410) and the exit itself. Concrete repair work was set to begin Nov. 17 and is expected to last one week. The South Dakota Department of Transportation says the work is in progress and has not published an end date. Pavement repair fixes cracked or broken concrete so the road surface stays smooth and safe to drive on.

Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest.

See something wrong? How corrections work — every correction ships with a diff + timestamp.

How this desk works

Where this comes from

This listing comes from the South Dakota Department of Transportation's public traveller information, served through its vendor's content network. Neither host publishes a robots.txt or terms-of-use page, so no access directive exists either way; the department's own fields are reproduced with attribution, and no licence is claimed that nobody granted.

How the times are shown

The department publishes start and end as numeric timestamps, so each is shown as a clock reading in both of South Dakota's zones.

How the status is decided

Whether work is currently underway is not written into the article text, deliberately: it depends on when you are reading. It is worked out from the listed dates each time the page loads rather than stored as an answer that would go out of date without anyone noticing. The status at the top of the page is that calculation, not a claim the department made.

The department's description is put into plain words by fixed rules only: its standard opening line is replaced, times and dates are written the way people say them, and direction words lose their capitals mid-sentence. Nothing is added, and every number, place and time it gives is kept; a description in a shape those rules were not written for is quoted exactly as published. A detail inside it can be superseded without the surrounding fields changing.

Around this record

The records published so far include 7 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.

This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.

Email me when this record changes

These records are re-read on a schedule. Pick something this record states, and you'll hear when it is corrected or the filing behind it is amended — and when any other published record states that same value under that same field, whichever body published it.

What would you like to follow?

Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number or an employer — never a person's name or a street address. What following means · Privacy notice

Search every article ever published.