Restrictions: miscellaneous construction listed on US-14A from Aug. 31, 2026
The South Dakota Department of Transportation lists Restrictions: miscellaneous construction at US-14A from Junction US 14A-Cheyenne Crossing to 0.75 mile north of Junction US 14A-Cheyenne Crossing, with a listed start of Aug. 31, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Restrictions: miscellaneous construction is listed at US-14A from Junction US 14A-Cheyenne Crossing to 0.75 mile north of Junction US 14A-Cheyenne Crossing, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as US-14A, the reference milepost as 21.007 and the affected direction as Both Directions.
The feed publishes a listed start of Aug. 31, 2026, 7:37 a.m. MDT / 8:37 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 44.2949169846273, -103.854820913319 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
Restrictions include: width limit 12 ft until further notice. This is structural project to remove and replace a box culvert on Ice Box Creek crossing US14A approximately one quarter mile east of Cheyenne Crossing. Traffic will be reduced to a single lane and controlled by temporary signals and barriers. Motorists should be prepared for stopped traffic and construction workers, equipment, and excavations adjacent to the driving lane. Traffic is anticipated to return to two lanes by November 2026.
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.