public-safety
Road work: fresh oil, miscellaneous construction, paving listed on SD-271 from April 13, 2026
The South Dakota Department of Transportation lists Road work: fresh oil, miscellaneous construction, paving at SD-271 from Junction South Dakota 10 to North Dakota State Line, with a listed start of April 13, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Road work: fresh oil, miscellaneous construction, paving is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as SD-271, the reference milepost as 18.311 and the affected direction as Both Directions.
The feed publishes a listed start of April 13, 2026, 7:29 a.m. MDT / 8:29 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 45.85432227, -99.80097996 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is in progress: fresh oil, miscellaneous construction adjacent to the roadway, and paving with delays 15 minutes, flaggers, lanes reduced to 1, and pilot car Monday through Saturday between 6:00 AM and 8:00 AM until further notice. Asphalt Paving
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.