Skip to main content
605Buzz

Corrections record

Public safety / First published

Road work: fresh oil, miscellaneous construction, paving listed on SD-271 from April 13, 2026

Published automatically from public-record data — not reviewed by an editor. This heading is the article's current headline.

Article identifier: sd511-road-work-12902049

Read the live article →

Version history

Every published version of this article, newest first. Versions are append-only: a correction adds a row, it never rewrites history. Each version below states what changed against the version before it — which fields moved, and which body lines were added or removed.

The content hash is a SHA-256 fingerprint of that version's stored headline and body, computed when the version was written. Two versions with the same hash hold identical text; a changed hash proves the text moved. It is the tamper-evidence check — recompute it against an exported copy of a version and any silent edit shows up as a mismatch.

How we verify a hash — and how you can

Canonicalization: the hashed bytes are the version's stored headline, then the two characters ||, then the version's stored body markdown — UTF-8, SHA-256, lowercase hex. Nothing else is in the input: no normalization, re-wrapping or rendering is applied first, no trailing newline is added, and no other field (including the parent version's id) is mixed in.

Export a version's stored headline and body, join them with the two characters ||, and take the SHA-256 of the UTF-8 bytes. It must equal the hash printed beside that version. In a shell:

printf '%s' "HEADLINE||BODY" | shasum -a 256
  1. Version 6

    Clarification

    operator: removed a sentence about where the current status is shown. It described the article page, and the dek is the only prose in /feed.json — where there is no page. No fact about the road changed.

    No change to the stored headline or body text was recorded for this version. (compared against version 5)

    Content hash: 55ce26814c757439d618065aaee4886e4312e378272160c15e639fd6f7161b54

  2. Version 5

    Source update — the underlying public record changed

    Automated update from the source feed — no human edit

    The headline and the body text both changed. (compared against version 4)

    Headline at this version: Road work: fresh oil, miscellaneous construction, paving listed on SD-271 from April 13, 2026

    Removed (3 lines )

    • **Road work: paving, miscellaneous construction, fresh oil** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.
    • The feed publishes a listed start of 2026-04-13T13:29:00.000Z and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Times are given in UTC as converted from the feed's own numeric timestamps.
    • > The following road construction project is in progress: fresh oil, miscellaneous construction adjacent to the roadway, and paving with delays 15 minutes, flaggers, lanes reduced to 1, and pilot car Monday through Saturday between 6:00 AM and 8:00 AM until further notice. Milled surfaces and Asphalt Paving

    Added (3 lines)

    • **Road work: fresh oil, miscellaneous construction, paving** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.
    • The feed publishes a listed start of April 13, 2026, 7:29 a.m. MDT / 8:29 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. The feed publishes those as numeric timestamps, so each is shown as a clock reading in both of South Dakota's zones — Mountain first, Central second. They are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
    • > The following road construction project is in progress: fresh oil, miscellaneous construction adjacent to the roadway, and paving with delays 15 minutes, flaggers, lanes reduced to 1, and pilot car Monday through Saturday between 6:00 AM and 8:00 AM until further notice. Asphalt Paving

    Content hash: 55ce26814c757439d618065aaee4886e4312e378272160c15e639fd6f7161b54

  3. Version 4

    Source update — the underlying public record changed

    Automated update from the source feed — no human edit

    The headline and the body text both changed. (compared against version 3)

    Headline at this version: Road work: paving, miscellaneous construction, fresh oil listed on SD-271 from April 13, 2026

    Removed (1 line )

    • **Road work: miscellaneous construction, paving, fresh oil** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.

    Added (1 line)

    • **Road work: paving, miscellaneous construction, fresh oil** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.

    Content hash: 749246ff79179590956a8d3ee0ac820e1d377af57f99bda95dfa121f775d8f67

  4. Version 3

    Source update — the underlying public record changed

    Automated update from the source feed — no human edit

    The headline and the body text both changed. (compared against version 2)

    Headline at this version: Road work: miscellaneous construction, paving, fresh oil listed on SD-271 from April 13, 2026

    Removed (1 line )

    • **Road work: miscellaneous construction, fresh oil, paving** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.

    Added (1 line)

    • **Road work: miscellaneous construction, paving, fresh oil** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.

    Content hash: d6bcf1464890fb9cf6af5a5a99deb7783194cc9844b4407da9b1febd243d95eb

  5. Version 2

    Source update — the underlying public record changed

    Automated update from the source feed — no human edit

    The headline and the body text both changed. (compared against version 1)

    Headline at this version: Road work: miscellaneous construction, fresh oil, paving listed on SD-271 from April 13, 2026

    Removed (1 line )

    • **Road work: fresh oil, miscellaneous construction, paving** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.

    Added (1 line)

    • **Road work: miscellaneous construction, fresh oil, paving** is listed at SD-271 from Junction South Dakota 10 to North Dakota State Line, according to the South Dakota Department of Transportation's traveller-information feed.

    Content hash: 469f78a444489356c3c7ce79eb5ea19f0f3d893506033d5820202d157d955100

  6. Version 1

    Initial publication

    Initial automated publication — no human byline

    No earlier version is in this record, so there is nothing to compare against.

    Content hash: 31a1f980b11243dc6849c2ecad90a7bfacff6e9df22482cdbf07fe7b30ac5d04

5 corrections have been issued.

See something wrong? Read the corrections policy or write to corrections@605buzz.com.